Project Overview

  • This project will design and construct a new four-lane, median divided segment of Northstar Boulevard from Shreveport Drive to U.S. Route 50. The project scope includes a 10 foot wide shared use path on both sides of the roadway and a traffic signal at Route 50. At the northern end of the project, a new bridge will carry Northstar Boulevard over North Fork Broad Run. Evergreen Mills Road will then be realigned to the south to intersect with Northstar Boulevard.
  • In conjunction with new construction, the project will improve two intersections:
    • The intersection at Youngwood Lane will be realigned from its existing intersection with Racefield Lane to a new connection with Northstar Boulevard. This new connection will become the western end of the planned Dulles West Boulevard.
    • Racefield Lane will be reconstructed and widened, and it will become the primary access point to the Virginia Department of Transportation (VDOT) Arcola Area Headquarters.
  • Once constructed, the new 1.6 mile segment of Northstar Boulevard will serve as a minor arterial roadway from John Mosby Highway (Route 50) to Shreveport Drive. It is also part of what will be a 14 mile, uninterrupted corridor extending from Route 7 south to the Prince William County line.
  • Funding for the project includes a $25 million Fiscal Year 2017 Transportation Investment Generating Economic Recovery (TIGER) discretionary grant from the U.S. Department of Transportation.  Funding for this $90 million project is also provided by VDOT, the Northern Virginia Transportation Authority and Loudoun County.
  • The project is currently estimated for completion in mid-2024.

Current Status:  August 2020

  • The evaluation of Technical Proposals from the design-build companies will take place in August 2020.
  • On June 23, 2020, proprietary meetings were held with the shortlisted design-build companies. 
  • Work on the design phase of the design/build contract is estimated to begin in December 2020.